ACTUAL @7:30
-
Unit was running @ 120 – 150MW during the night
Program for today : Boiler tuning with one and 2 mills
(Hitachi)
ACTUAL @23:00
-
8:27
Turbine on protection HP Exhaust High due to boiler load reduction
-
9:12
Synchronization
-
9:18
Turbine on protection HP Exhaust High due to boiler load reduction
-
Boiler
shut down to restart with 2 draft groups, second mill cannot be started with
only one draft group
-
16:30
Boiler fire in
-
19:00
Synchronization
-
20:32
Load 300MW
-
22:11
Boiler air heater motor high current, load reduced to 150MW
-
22:14
Turbine on protection HP Exhaust High due to boiler load reduction